Test Name | Test Method | Lead Time | Yardage | |
---|---|---|---|---|
British Drapery | BS 5867 Part 2, Type B | 1-2 days | 36" x Full | |
British Drapery | BS 5867 Part 2, Type C | 1-2 days | 36" x Full | |
British Protective Clothing | BS EN ISO 15025 | 1-2 days | 36" x Full | |
Test Name | Test Method | Lead Time | Yardage |
---|---|---|---|
Part 1 | |||
Smoldering Cigarette (Source 0) | BS 5852/7176 | 3-4 days | 54" x Full |
Butane Flame (Source 1) | BS 5852/7176 | 3-4 days | 54" x Full |
Part 2 | |||
Butane Flame (Source 2) | BS 5852/7176 | 3-4 days | 54" x Full |
Butane Flame (Source 3) | BS 5852/7176 | 3-4 days | 54" x Full |
Crib Ignition (Source 4) | BS 5852/7176 | 3-4 days | 54" x Full |
Crib Ignition (Source 5) | BS 5852/7176 | 3-4 days | 54" x Full |
Crib Ignition (Source 6) | BS 5852/7176 | 3-4 days | 54" x Full |
Crib Ignition (Source 7) | BS 5852/7176 | 3-4 days | 54" x Full |
Test Name | Test Method | Lead Time | Yardage |
---|---|---|---|
Small Scale | CAN/ULC S109 | 1-2 days | 18" x Full |
Large Scale (Folds) | CAN/ULC S109 | 1-2 days | 3 yds x Full |
Large Scale (Flat) | CAN/ULC S109 | 1-2 days | 3 yds x Full |
Test Name | Test Method | Lead Time | Yardage |
---|---|---|---|
Mattress Prototype Testing (2 tests) | 16 CFR 1632 | 3-4 days | 2 sleeping surfaces |
Mattress Pads Prototype Testing (6 tests) | 16 CFR 1632 | 3-4 days | 6 mattress pads |
Mattress Ticking Prototype Testing | 16 CFR 1632 | 2-3 days | 36" x Full |
Business & Institutional Furniture Manufacturer's Association | 2-3 days | 36" x Full | |
California Technical Bulletin #116 | 2-3 days | 2 samples | |
California Technical Bulletin #117 | |||
Section 1: Cover Fabric Test | 1-2 days | 18" x Full | |
Section 2: Barrier Materials Test | 1-2 days | 18" x Full | |
Section 3: Resilient Material Test | 1-2 days | ||
Section 4: Decking Material Test | 1-2 days | 36" x 18" | |
UFAC/NFPA 260 | |||
Fabric Classification | UFAC/NFPA 260 | 1-2 days | 18" x Full |
Welt Cord | UFAC/NFPA 260 | 1-2 days | 1 yrd |
Decking Materials | UFAC/NFPA 260 | 1-2 days | 18" x 18" |
Filling/Padding Component | UFAC/NFPA 260 | 1-2 days | |
Barrier | UFAC/NFPA 260 | 1-2 days | 24" x 24" |
Interior Fabrics | UFAC/NFPA 260 | 1-2 days | 18" x Full |
Decorative Trim | UFAC/NFPA 260 | 1-2 days | 36" x Full |
Test Name | Test Method | Lead Time | Yardage |
---|---|---|---|
Flammability of Interior Materials (Cars, Trucks, Multi-Purpose Passenger Vehicle, Busses) | FMVSS302 CMVSS302 | 1-2 days 1-2 days | 18" x Full 18" x Full |
Federal Aviation Administration | FAR 23.853/25.853 | 1-2 days | 18" x Full |
Carpets & Rugs | 16 CFR 1630/1631 | 3-4 days | 18" x 36" |
Sleeping Bags | CPAI-75 | 2-3 days | 2 bags |
Test Name | Test Method | Lead Time | Yardage |
---|---|---|---|
Smoldering Cigarette | IMO 652 (16) | 3-5 days | 54" x Full |
Butane Flame | IMO 652 (16) | 3-5 days | 54" x Full |
Drapery Material | IMO 2010 FTP Code, Part 7 | 1-2 days | 36" x Full |
Upholstery | IMO 2010 FTP Code, Part 8 | 3-5 days | 54" x Full |
Bedding | IMO 2010 FTP Code, Part 9 | 3-5 days | 54" x Full |
Test Name | Test Method | Lead Time | Yardage |
---|---|---|---|
Flame Resistance of Cloth | ASTM D6413 | 1-2 days | 18” x Full |
Flame Resistance of Cloth | FSTM-191-5903 | 1-2 days | 18” x Full |
Boston Fire Dept. | BFD IX-1 | 1-2 days | 18” x Full |
New York City | New York Bulletin No. 44 | 1-2 days | 18” x Full |
California Title 19 (Indoor Materials) | State of California, 1237 | 1-2 days | 18” x Full |
California Title 19 (Outdoor Materials) | State of California, 1237 | 7-10 days | 54” x Full |
Federal Aviation Administration | FAR 23.854/25.653 | 1-2 days | 18” x Full |
National Fire Protection Association | NFPA 701-89 Small Scale | 1-2 days | 18” x Full |
National Fire Protection Association | NFPA 701 Test 1 | 1-2 days | 36” x Full |
National Fire Protection Association | 1-2 days | ||
Folds | NFPA 701 Test 2 | 1-2 days | 3 yds x Full |
Strips | NFPA 701 Test 2 | 1-2 days | 3 yds x Full |
Field Test | NFPA 705 | 1-2 days | 12" x 12" |
Camping Tentage (Wall Material) | CPAI-84 | Original 1-2 days Full 7-10 days | 18” x Full 54” x Full |
Camping Tentage (Flooring Material) | CPAI-84 | Original 1-2 days Full 7-10 days | 18” x Full 54” x Full |
Children's Sleepwear | 16 CFR 1615/1616 | 2-3 days | 18” x Full |
Seams/Trim (Prototype) | 17 CFR 1615/1616 | 2-3 days | |
Garment Production | 18 CFR 1615/1616 | 2-3 days |
Test Name | Test Method | Lead Time | Yardage |
---|---|---|---|
Flammability of Wearing Apparel | NFPA 702 (original & after) | 2-3 days | 18" x Full |
Flammability of Apparel Textiles | ASTM D-1230 (original & after) | 2-3 days | 18" x Full |
Flammability of Clothing Textiles | 16 CFR Part 1610 (original only) | 1-2 days | 12" x Full |
Flammability of Clothing Textiles | 16 CFR Part 1610 (original & after) | 2-3 days | 24" x Full |